|

Budget Workshop
City Hall, Cherokee, Iowa
February 2, 2009 – 5:30 P.M.
A budget workshop was called to order on this date by
Mayor Pierce. Present: Council Members Burkhart,
Mallory, Peck, Stieneke, Leach, Administrator Eikmeier, Clerk-Treasurer Taylor.
The council met to continue
review of the 2009-10 budget. Administrator Eikmeier gave a brief overview
stating
that department heads were told that there were basically no new revenues and
that this years’ budget will be tight.
Several departments turned in projects that are not in the budget, but that they
felt were important. The two
employee unions are in the second year of a two-year contract, so those wages
are set. The same amount has been
added to the budget for supervisory and non-union employees. Comparable cities
have been surveyed regarding
supervisory wages and although the council may not be able to make any changes
this year, he wants them to be
aware of what other cities are paying. The next budget meeting was set for
Monday, February 16 at 5:30 p.m. at
which time the council will discuss the total budget, unfunded projects,
salaries, and management recommendations
on balancing the budget.
The council then heard a summary
of budget requests from Department Heads.
Street: would like to crush
concrete chunks from the Indian Street project, which would save having to
purchase the
material; requesting a new sander, plate compactor and jackhammer; Birch Street
bridge replacement, city’s cost
$35,000-$55,000, not in budget, but will be added when better estimate is
known.
Park: budget includes roof and
door repair; seal coat roads in Spring Lake Park.
Community Center: hire
custodian by spring; roll-over phone line to City Hall when community center
isn’t staffed;
alarm system monthly fee; should be considerable savings in utilities with the
new heating/cooling system.
Recreation: replace Westcott
shelter roof; volleyball referee standards; bases; sand for volleyball courts;
infield materials.
Pool: umbrellas; lounge chairs;
concession stand canopy
Water (City): part-time,
seasonal employee for mowing; roofs on E. Main Street buildings; distribution
system
maintenance-dead end lines, hydrants, valves; distribution system modeling; used
vehicle for part-time employee;
annual tower maintenance on 3 water towers; removal of N. 1st St.
reservoir could add to crushed concrete stockpile-not
included in budget. Administrator Eikmeier noted that although the $200,000
transfer for bond payments will no longer be
needed, he would like to continue setting aside this amount for future
improvement projects if possible. This will be
reviewed further.
Water (Industrial): roof and
door replacements on all buildings.
Sewer (City): although not
funded in this budget, the council will be asked to consider three capital
projects – rebuild
south Hwy. 59 lift station-$160,000, gravity line to replace part of Hwy. 59
force main-$14,500, and Beech Street lift
station grinder-$90,000. If funds aren’t available from one years’ budget,
possibly get a short-term (3 yr.) loan from a local bank.
Mayor Pierce had another
commitment and turned the meeting over to Mayor Pro-tem Leach at 6:50 p.m.
Council: includes funding for
council elections in the fall.
Mayor/Administrator:
Administrator’s salary is shown in this budget, but 90% of the salary is paid
from water, sewer and
road use; travel and conference expense covers a statewide conference in Iowa
City.
City Hall: includes funding for
part-time janitor, could combine with community center janitor.
Planning & Zoning: funding
included for a land use plan for the comprehensive plan update. A 47% grant
would be
available through SIMPCO for this project.
Building Inspection: will
review this further. Checking with other county seats to see how they handle
inspections –
contract or share.
Debt Service: covers annual
principal and interest payments on general obligation bonds.
In summary, Administrator
Eikmeier pointed out several items that are not included in this budget, but
that he feels are
important: computer control gas pumps for security control-$15,000 split among
all departments using the pumps;
magnetic manhole lid lifter for safety purposes-$6,000 split water, sewer,
street; demolition of buildings; computer
server at City Hall-$5,000; GIS mapping-start with a $10,000 minimum
investment-water, sewer, street; push button
door opener for main doors (both levels) at community center.
On a motion by Stieneke, seconded by Burkhart, the
meeting was adjourned at 7:10 p.m. Motion carried.
Pam Pierce – Mayor
ATTEST:
Debra Taylor, CMC
City Clerk-Treasurer
|